Project documents


CONCESSION APPLICATION

Executive summary (pdf, 64kb)
Introduction (pdf, 326kb)
 The Concession (pdf, 1mb)
The Concession Fig 2.1 Route Map (pdf, 912kb)
The Concession Fig 2.2 Eastern Terminus – Kiwi Burn (pdf, 431kb)
The Concession Fig 2.3 Western Terminus – Te Anau Downs (pdf, 426kb)
Existing Environment (pdf, 1mb)
Facilities & Infrastructure (pdf, 157kb)
Construction (pdf, 401kb)
Operation (pdf, 115kb)
Statutory Planning (pdf, 87kb)
Assessment of Environmental Effects (pdf, 202kb)
Avoidance, Mitigation & Monitoring (pdf, 72kb)
Alternatives (pdf, 66kb)
Consultation Process (pdf, 53kb)
Suggested Conditions (pdf, 49kb)
Conclusion and References (pdf, 55kb)

Appendix A

Draft DOC Communications Protocol (pdf, 67kb)

Appendix B

Draft Construction Management Plan (pdf, 697kb)

Appendix C

Draft Operations & Environmental Management Plan (pdf, 94kb)

Appendix D

Certificates of Title (pdf, 923kb)

Appendix E

Prelim Engineering Assessment (pdf, 1mb)
Prelim Engineering Assessment – Prelim Construction Programme (pdf, 210kb)
Prelim Engineering Assessment – Drawings 1, 2 & 3 (pdf, 816kb)
Prelim Engineering Assessment – Kiwi Burn Terminus Site Plan (pdf, 647kb)
Prelim Engineering Assessment – Route Map 1 (pdf, 1.6mb)
Prelim Engineering Assessment – Route Map 2 (pdf, 960kb)
Prelim Engineering Assessment – Route Map 3 (pdf, 1mb)
Prelim Engineering Assessment – Route Map 4 (pdf, 942kb)
Prelim Engineering Assessment – Route Map 5 (pdf, 938kb)
Prelim Engineering Assessment – Te Anau Downs Terminus (pdf, 570kb)
Prelim Engineering Assessment – Monorail Information (pdf, 601kb)
Prelim Engineering Assessment – Geotechnical Data (pdf, 1.4mb)

Appendix F

Hydrology & River Geomorphology Assessment (pdf, 1.9mb)

Hydrology & River Geomorphology Assessment Figs 14-31 (pdf, 811kb)

Appendix G

Assessment of Potential Effects on Aquatic Ecology (pdf, 1.2mb)


Appendix H


Noise Assessment (pdf, 988kb)

Appendix I


 Terrestrial Ecology Report 2009 (pdf, 1.8mb)
Terrestrial Ecology Report Figs 6-7 (pdf, 1.2mb)
Terrestrial Ecology Report Figs 11-13 (pdf, 465kb)

Appendix J


Landscape Effects Report (pdf, 306kb)
Landscape Effects Report Figs 1-10 (pdf, 972kb)
Landscape Effects Report Figs 11-20 (pdf, 1mb)
Landscape Effects Report Figs 21-34 (pdf, 1mb)

Appendix K


Tourism Assessment (pdf, 828kb)

Appendix L


Recreation Effects Report (pdf, 1.4mb)
Recreation Effects Report Appendix 3 & 4(pdf, 1.8mb)

Appendix M


Cultural Impact Assessment (pdf, 1mb)

Appendix N


Transportation Assessment Report (pdf, 277kb)
Transportation Assessment Report Fig 1 (pdf, 1mb)
Transportation Assessment Report Fig 2 (pdf, 1mb)
Transportation Assessment Report Figs 3-6 (pdf, 976kb)
Transportation Assessment Report Figs 7-9 (pdf, 1mb)

Appendix O


Catamaran and ATV Descriptions (pdf, 12kb)

Appendix P


Architecture Report Pages 1-3 (pdf, 688kb)
Architecture Report Pages 4-6 (pdf, 1.4mb)
Architecture Report Pages 7-8 (pdf, 908kb)
Architecture Report Pages 9-10 (pdf, 981kb)
Architecture Report Plans Elevations Floorplan Kiwi Burn (pdf, 175kb)
Architecture Report Plans Elevations Kiwi Burn Terminus (pdf, 1.9mb)
Architecture Report Plans Perspective Kiwi Burn (pdf, 2mb)

CONCESSION CONDITIONS REPORT

Concession Conditions Report (pdf, 1.3mb)

MANAGEMENT PLANS

Construction Management Plan (pdf, 263kb)
Draft Conditions (pdf, 203kb)
Implementation Protocol (pdf, 63kb)
Operational Management Plan (pdf, 63kb)
Recreation Users Management Plan Alt Kiwiburn Terminus Site Plan (pdf, 1.55mb)
Recreation Users Management Plan Route & Terrain Plan (pdf, 194kb)
Recreation Users Management Plan (pdf, 114kb)
Vegetation Habitat Management Plan (pdf, 128kb)

IN THE MATTER OF AN APPLICATION TO CONSTRUCT, OPERATE, AND MAINTAIN A MONORAIL AND ASSOCIATED FACILITIES

Written reply on behalf of Riverstone Holdings Ltd, 18 May 2012 (pdf, 2.1mb)